Click Deck

Follow Us On

CLICKDECK FOR HOMES

Build Faster, Build Smarter With ClickDeck®

Build your dream deck with CLICKDECK®

Ensure your deck will last with the Clickeck Aluminium Frame system

TIME TO UPGRADE FROM TIMBER?

2 year old H3 treated pine deck frame on concrete

The frame is the most important part of a deck build.

H3 Treated Pine Framing is succetible to termites and wood rot.

H3 Treated pine framing needs a minimum of 150mm clearance by Australian Standards.

Remove the risk and cost by using CLICKDECK’s Aluminium subframe system.

5 Year old H3 Timber Deck frame

TIMBER FRAME FAILURE Decking boards still in perfect condition but full frame replacement needed

2 year old H3 treated pine deck frame on concrete

The frame is the most important part of a deck build.

H3 Treated Pine Framing is succetible to termites and wood rot.

H3 Treated pine framing needs a minimum of 150mm clearance by Australian Standards.

Remove the risk and cost by using CLICKDECK’s Aluminium subframe system.

5 Year old H3 Timber Deck frame

TIMBER FRAME FAILURE Decking boards still in perfect condition but full frame replacement needed

Ensure your deck will last with CLICKDECK'S Aluminium frame

ClickDeck®

Easy colour coded plans

Each deck comes with easy to follow plans.

ClickDeck®

Easy colour coded plans

Our Gallery

Our Gallery

CLICKDECK SUPPORTS:

CLICKDECK CAN BE BUILT OVER:

CLICKDECK APPLICATIONS:

CLICKDECK SUPPORTS:

CLICKDECK CAN BE BUILT OVER:

CLICKDECK APPLICATIONS: